Size and Separation
Maximum size 1,200 square feet
Side/rear setbacks 4 feet
Two story Yes
Building separation 6 feet
Additional Requirements
Soils Report No
Building Verification Survey No
Coastal permit (in some areas) No
Stormwater Mitigation No
Number of ADUs Allowed
On El Cajon single-family residential lots, you may build one ADU (either attached or detached) and one Junior ADU (JADUs have an owner occupancy requirement and must be converted from existing space within the primary residence).
El Cajon allows up to 2 detached ADUs for multifamily lots with an existing multi-family building. (Meaning: In order to build 2 ADUs, the property must already have at least a duplex on it, not just a single family dwelling)
Effective Jan 2025 (SB1211): Multifamily property owners are permitted to build as many ADUs as there are existing units, with a maximum of eight detached ADUs. This change is due to California state law and will pre-empt existing local laws that are not brought into conformance.
Non‐livable space within existing multi‐family structures may be converted into an ADU. Examples of areas that can be converted include storage rooms and garage spaces. The maximum number of ADU allowed in a multi‐family structure is equal to 25% of the number of existing multi‐family units in the structure. Fractional units are rounded down. A minimum of one conversion ADU is allowed
ADU Size & Building Constraints
The maximum size of an attached or detached ADU is not more than 1,200 sqft, but under no circumstances shall the ADU be larger than the primary dwelling unit.
Lastly, ADUs up to 800 square feet are exempt from lot coverage requirements. (Meaning: You can build an ADU of this size even if you’re maxed out on lot coverages).
ADU height may be as high as the underlying zone when located within the primary dwelling unit setback requirements. So yes, you may build a two story ADU so long as it conforms to underlying zoning.
Height limitations for areas outside of the primary dwelling unit setbacks are as follows:
-
Maximum height of 20 feet with 5 foot setbacks; no more than 16 feet with 4 foot setbacks; not more than 12 feet with 3 foot setbacks.
-
When the ADU is withing 1/2 mile walking distance of a major transit stop or a high-quality transit corridor, the height is limited to 18′ with up to two additional feet permitted to accommodate a roof pitch so long as it is aligned with the roof pitch of the primary dwelling
-
When the ADU is located on a lot with an existing or proposed single or multifamily dwelling that is two or more stories, the height is limited to 18′
Read more about two story ADUs and height limits.
-
Attached covered patios, porches, and similar covered areas intended to bused by the occupant of the ADU, except for a garage or carport, shall be limited to a max of 10% of the floor area of the proposed unit
The proposed accessory dwelling unit shall be constructed of similar building materials, colors, and with a similar architectural style to the primary dwelling unit.
For units over 800 sqft, El Cajon has a design requirement of “wall plan articulation” for lengths of wall beyond 30′. In other words, there must be a “jog” of at least 18″ deep in the wall and continue for at least 4′.
Setbacks
ADUs setbacks vary depending on the height of the unit as follows:
-
Maximum height of 20 feet with 5 foot setbacks
-
Maximum height of 16 feet with 4 foot setbacks
-
Maximum height of 12 feet with 3 foot setbacks
-
Or maximum height conforming with underlying zoning setbacks
-
The minimum required distance between structures is 6′.
Additional Requirements
No, El Cajon allows digital submission of applications for an ADU.
Yes, El Cajon is the only municipality we are currently aware of that requires a sewer lateral video. This video is something SnapADU handles during the Feasibility portion of the project, though sometimes a higher-definition video inspection may also be required.
Per the City of El Cajon Public Works Wastewater Administration Department as of June 2022:
“Property owners are responsible for their entire private lateral (upper and lower within the right-of-way/easement) from the building up to and including the connection with the City sewer main, since the private sewer main is the exclusive use of a single party and not a part of the municipal system.
Any dig/replace work within the ROW/easement would require a separate encroachment permit (EP) and traffic control, as needed. If a lower lateral can be repaired with a cured-in-place liner without active work, vehicles, obstructions, etc. in the ROW an EP would not (likely) be required.”
No, El Cajon does not mandate soils reports for ADUs.
No areas are subject to Coastal requirements.
Parking
A parking space is not required for an ADU in any of the following instances:
-
Within a one-half mile walking distance from public transit, which includes bus stops.
-
Within an established historic district.
-
Converted from the existing space of a primary residence or accessory structure, or are attached to an existing or proposed primary residence.
Effective Jan 2025 (SB1211): When a garage, carport, covered parking structure, or uncovered parking space is demolished or converted for construction of an ADU, replacement parking will not be required.
-
If a parking space is required, it may be located within the setbacks and in an existing driveway as tandem parking. Parking spaces don’t need to be replaced when a garage, carport, or covered parking structure is demolished in conjunction with the construction of an ADU or converted to an ADU.